CARPENTERS – DATA CENTER CONSTRUCTION

Carpenterfull-time·Reno, NV·Sparks
$30/hr
full-timemid level

Carpenters

Description

CARPENTER – DATA CENTER CONSTRUCTION

Location: Sparks, NV

Pay Rate: $30 per hour
Schedule: Full-time; schedule may vary by project needs
Job Type: Long-Term Temporary
Project Duration: Multi-year data center project

PeopleReady Skilled Trades is hiring experienced Carpenters for a long-term data center construction project in Sparks, Nevada. This is an excellent opportunity for dependable tradespeople seeking steady, full-time work on a project expected to continue for several years.

Job Responsibilities:

  • Perform general and commercial carpentry work throughout the construction site
  • Measure, cut, assemble, and install wood and other construction materials
  • Build temporary walls, barricades, platforms, ramps, and site protection
  • Assist with framing, backing, blocking, formwork, and structural support
  • Install doors, hardware, panels, trim, and other building components as needed
  • Read and follow blueprints, drawings, measurements, and supervisor instructions
  • Use hand and power tools safely and correctly
  • Assist other skilled trades and construction crews when required
  • Maintain a clean, organized, and safe work area
  • Follow all site-specific safety procedures and data center security requirements
Qualifications:

  • Previous commercial or industrial carpentry experience required
  • Data center or large-scale construction experience preferred
  • Ability to accurately measure, cut, level, plumb, and install materials
  • Experience using saws, drills, impacts, levels, and standard carpentry tools
  • Ability to read basic construction plans and layouts
  • Reliable transportation to the Sparks job site
  • Dependable attendance and ability to work the assigned schedule
  • Ability to pass applicable project screening and site-access requirements
  • Ability to work independently and as part of a construction team
Physical Requirements:

  • Ability to lift and carry up to 50 pounds
  • Ability to stand, bend, kneel, climb, and work for extended periods
  • Comfortable working indoors and outdoors in changing conditions
  • Ability to safely work from ladders, lifts, or elevated areas when required
Benefits of Working with PeopleReady Skilled Trades:

  • Competitive pay at $30 per hour
  • Weekly pay
  • Long-term, consistent work
  • Health insurance benefits
  • Opportunities to develop your skills and advance your construction career
Apply today to join PeopleReady Skilled Trades and become part of a major, multi-year data center construction project in Sparks, Nevada.

Contact

Posted Jul 23, 2026 (15 hours ago)