Drywall Finishing Superintendent/Superintendente de Drywall

Painterfull-time·Miami, FL·miami / dade county
Competitive weekly pay — based on experience / Pago semanal competitivo — según experiencia
full-time

Drywall Finishing Superintendent/Superintendente d

Description

What You Own

  • Production: hold unit-per-week rates through taping, coating, sanding, and texture, and track crew output by unit and by floor rather than by feel.
  • Finish quality: deliver the specified finish level consistently — Level 4 and Level 5 where called for, correct texture, clean corner bead, and no telegraphing or fastener pops at paint.
  • Conditions: manage temperature, humidity, ventilation, and drying time so coats cure on schedule; call for temporary power, heat, or dehumidification before it costs a week.
  • Sequencing: coordinate with hanging so finishing follows without gaps, and with paint so the handoff is clean and the walls are not being reworked twice.
  • Punch and repair: run the ding-and-patch cycle after MEP trim, door and trim install, and flooring, and close punch by unit rather than letting it pile up at the end.
  • Protection and cleanliness: dust control, floor and finish protection, and daily cleanup. Finishing gets blamed for everyone else damage unless you document.
  • Material control: mud, tape, bead, and texture material staged by floor with waste tracked.
  • Manpower planning: forecast tapers, finishers, and sanders three weeks out and justify the count against the unit release schedule.
  • Safety: stilts and lift discipline, silica and dust exposure control, ventilation, and PPE enforcement.
  • Documentation: daily manpower and unit production, lookaheads, delay notices, damage documentation with photos, and T&M tickets.
The Standard We Hire To
  • You run a schedule, not a to-do list. You know what has to be complete this Friday to protect the following Friday, and you say so out loud before it slips.
  • You forecast. You can tell the office three weeks out how many men you need, on what floors, and what will stop you if it does not show up.
  • You are organized to the point of being predictable — same reporting, same walk, same numbers, every day, without being asked twice.
  • You hold the line on production and quality without running people off. Crews should know exactly what you expect and exactly where they stand.
  • You put it in writing. Manpower, production, delays, damage, and directives from others get documented the day they happen.
What You Need
  • Five or more years in commercial or multifamily drywall finishing, including three or more running finishing as a superintendent or general foreman.
  • Multiple multifamily projects delivered. Be ready to name the projects and the unit counts.
  • Fluent in finish levels and specifications, texture types, and what it takes to get a wall to pass under critical lighting.
  • Able to read plans and finish schedules and to produce a manpower forecast and three-week lookahead in writing.
  • Comfortable in Procore or a similar platform, Bluebeam, and Excel or Google Sheets.
  • OSHA 30 required.
  • Bilingual English and Spanish required.
  • Able to pass background screening, drug screening, and site badging.
How to Apply
DavinWorks Workforce Solutions — contact us with your resume and the multifamily projects and unit counts you have run.
Call or text 786-509-3731 · dwrecruiting@davinworks.com

Lo Que Usted Maneja

  • Producción: sostener ritmos de unidades-por-semana a través del encintado, aplicación de manos, lijado, y textura, y rastrear la producción de la cuadrilla por unidad y por piso en lugar de al tanteo.
  • Calidad del acabado: entregar el nivel de acabado especificado de forma consistente — Nivel 4 y Nivel 5 donde se requiera, textura correcta, esquineros (corner bead) limpios, y sin telegrafiado ni pops de sujetadores al pintar.
  • Condiciones: manejar temperatura, humedad, ventilación, y tiempo de secado para que las manos curen a tiempo; pedir energía temporal, calor, o deshumidificación antes de que cueste una semana.
  • Secuenciación: coordinar con colgado para que el acabado siga sin huecos, y con pintura para que la entrega sea limpia y las paredes no se retrabajen dos veces.
  • Punch y reparación: manejar el ciclo de ding-and-patch después del trim de MEP, instalación de puertas y molduras, y pisos, y cerrar el punch por unidad en lugar de dejar que se acumule al final.
  • Protección y limpieza: control de polvo, protección de pisos y acabados, y limpieza diaria. Al acabado se le culpa por el daño de todos los demás a menos que usted lo documente.
  • Control de material: mud, cinta, bead, y material de textura preparados por piso con el desperdicio rastreado.
  • Planificación de mano de obra: proyectar tapers, finishers, y lijadores con tres semanas de anticipación y justificar el conteo contra el cronograma de liberación de unidades.
  • Seguridad: disciplina de zancos (stilts) y elevadores, control de exposición a sílice y polvo, ventilación, y cumplimiento de EPP.
  • Documenta

Contact

dwrecruiting@davinworks.com

786-509-3731

Posted Aug 12, 2026 (19 hours ago)