Finishing Drywall Foreman/ Foreman de Drywall Acabado
Competitive weekly pay — based on experience / Pago semanal competitivo — según experiencia
Finishing Drywall Foreman/ Foreman de Drywall Acab
Description
What You Own
- Daily production: know your crew number for the day before the shift starts, and know by lunch whether you will hit it.
- Layout: snap and build from the plans, wall type legend, and dimensions. Verify against the structure before the crew builds the wrong wall on the wrong line.
- Crew direction: assign men by unit and by stack, keep the crew loaded, and move people the moment a face is waiting.
- Assembly compliance: build rated and STC assemblies exactly as detailed — stud gauge and spacing, shaft wall, top-of-wall deflection, blocking, backing, and firestopping.
- Quality at the wall: plumb, straight, on layout, correct fastener pattern. You catch it, not the inspector.
- Material: keep board and studs staged ahead of the crew and keep stocked material protected and off the finished work.
- Coordination: work with the other trades on your floor on rough-in and close-in so nobody gets rocked in before they are ready.
- Safety and housekeeping: toolbox talks, PPE, clean floors, and clear paths every day.
- Reporting: crew hours, production by unit, and anything that slowed you down, turned in daily.
- You run a schedule, not a to-do list. You know what has to be complete this Friday to protect the following Friday, and you say so out loud before it slips.
- You forecast. You can tell the office three weeks out how many men you need, on what floors, and what will stop you if it does not show up.
- You are organized to the point of being predictable — same reporting, same walk, same numbers, every day, without being asked twice.
- You hold the line on production and quality without running people off. Crews should know exactly what you expect and exactly where they stand.
- You put it in writing. Manpower, production, delays, damage, and directives from others get documented the day they happen.
- Three or more years framing and hanging in commercial or multifamily, including two or more running a crew.
- Able to read plans, wall type legends, and rated assembly details and lay out from them independently.
- Proven ability to run a crew of eight to twenty and hold a daily production number.
- OSHA 30 preferred, OSHA 10 required.
- Bilingual English and Spanish required.
- Own hand tools and reliable transportation.
- Able to pass background screening, drug screening, and site badging.
DavinWorks Workforce Solutions — contact us with your resume and the multifamily projects and unit counts you have run.
Call or text 786-509-3731 · dwrecruiting@davinworks.com
What You Own
- Daily production: know the units your crew has to turn today, and flag it early when the number is at risk.
- Finish quality: hold the specified finish level across the whole crew, not just on your own work. Consistency between finishers is your job.
- Coat sequencing: keep taping, coating, sanding, and texture moving through units in order so nobody is standing around waiting on drying time.
- Conditions: watch temperature, humidity, and airflow, and tell the superintendent early when conditions will cost you a coat cycle.
- Punch and patch: run repairs after other trades cleanly and document damage you did not cause, with photos, the day you find it.
- Material: mud, tape, bead, and texture staged ahead of the crew, with waste controlled.
- Protection and cleanup: dust control and daily cleanup of your floors.
- Crew direction: assign by unit, keep everyone loaded, and correct sloppy work at the wall rather than at punch.
- Reporting: crew hours and units completed, turned in daily.
- You run a schedule, not a to-do list. You know what has to be complete this Friday to protect the following Friday, and you say so out loud before it slips.
- You forecast. You can tell the office three weeks out how many men you need, on what floors, and what will stop you if it does not show up.
- You are organized to the point of being predictable — same reporting, same walk, same numbers, every day, without being asked twice.
- You hold the line on production and quality without running people off. Crews should know exactly what you expect and exactly where they stand.
- You put it in writing. Manpower, production, delays, damage, and directives from others get documented the day they happen.
- Three or more years finishing in commercial or multifamily, including two or more running a crew.
- Able to hit and hold Level 4 and Level 5 finishes and the specified texture consistently.
- Able to read plans and finish schedules and work from a unit release list.
- Proven ability to run a crew of eight to twenty and hold a daily unit number.
